logo1.jpg

05 Dec Articles

CHQ letter regarding E2/E3 and Post 2007 batch Pay Loss

GS AIGETOA writes to CMD BSNL with a request to delink the proposal of replacement of E1A /E2A with the replacement of subsequent scales. AIGETOA has requested that CMD BSNL to consider replacement of initial two scales immediately. GS AIGETOA also writes to CMD BSNL to consider extending 22820/- as initial basic and that the same should be processed separately instead of linking it with replacement of standard pay scales proposal. 

 

Click here for letter